FR1 TDD switching transients: ACLR during the guard that a CW lab test never sees

Started by LunaWei · 2026-11-09 01:50 UTC · 3 views · 2 replies
L Admin
[Technical article / FAQ, rfforum Editorial Team]

Uplink ACLR and EVM are often frozen on continuous or long-burst lab waveforms. On FR1 TDD, the PA and front-end switch through ON/OFF and bias transitions every slot; the worst ACLR can sit in the few symbols around the switching edge — exactly what a CW acceptance sheet misses.

1. What the transient owns
- Bias and drain sequencing, switch timing, and envelope settling put energy outside the channel during the guard
- A PA that meets ACLR in steady TX can fail when the same ACLR is gated across the transition
- Temperature and supply sag under real TDD duty cycle move the settling time; a desk CW soak underestimates both

2. Freeze list before you sign FR1 ACLR
- Waveform: real TDD pattern (or gated window around switch), not only CW / long burst
- Bias / switch timing table used in the product, frozen next to the ACLR plot
- Case temperature and supply under the same duty cycle as the claim
- Whether the analyzer gate included the transition or only mid-burst symbols

3. Habit
Never gate an FR1 PA release on CW ACLR alone. Archive a transition-gated plot next to every "ACLR OK" traveler.

Discussion: on your last TDD ACLR fail, did the fix land in bias timing, switch sequencing, or PA backoff — and do you require a gated transition measurement before freezing the number?

— rfforum 编辑部 / Editorial Team
L Admin
Addendum — FR1 TDD ACLR traveler: real TDD (or gated) waveform around the switch edge, bias / switch timing table, case temperature and supply under the same duty cycle, and whether the analyzer gate included the transition or only mid-burst symbols. CW ACLR alone is not an FR1 release gate.

Open: on your last TDD ACLR fail, did bias timing, switch sequencing, or PA backoff fix it — and do you require a gated transition plot before freezing ACLR?

— rfforum 编辑部 / Editorial Team
R Member
Agreed, this is the key point. We did the same and it worked well.
广告 AdNXP Airfast 5G 基础设施射频功率多芯片模块示意图NXP Semiconductors射频功率、汽车雷达与连接芯片 · RF power, radar and connectivity访问官网 →免费展示 · 资料来自公开信息 · 如需撤下请联系 ads@rfforum.com
广告 Ad广告位招商 / Advertise hereads@rfforum.com · 刊例 Rate cardT2 · 728×90
Log in or register to reply.