Simulating connector-to-PCB transitions at 28 GHz: what the model misses about launch parasitics

Started by RF_Bench_Notes · 2026-11-21 13:02 UTC · 39 views · 5 replies
R Member
A connector-to-PCB launch that simulates clean at 28 GHz and measures badly is a familiar disappointment. In my experience the gap is rarely the connector model itself — it is the parasitics around the launch that never made it into the simulation.

The first thing I check is the pad stack. Most connector vendors supply a recommended footprint, but that footprint assumes a specific stackup. If your board uses a different dielectric thickness or a different prepreg, the pad capacitance changes, and the launch that was matched in the vendor's reference design is now mismatched in yours. I always rebuild the launch with the actual stackup before trusting any S-parameter result.

The second blind spot is the ground via fence. A sparse via pattern around the launch lets energy leak into parallel-plate modes, and the simulator will happily show you a clean return loss while the real board radiates. I place ground vias at roughly one-tenth wavelength spacing around the signal vias and verify with a field plot, not just a port plot.

The third is the solder and press-fit reality. A press-fit pin has a stub below the board; a soldered pin has a fillet that adds capacitance. Neither is in the ideal model. I add a small shunt capacitance estimate from the vendor's mechanical drawing and re-run — if the result moves more than a few tenths of a dB, the launch is too sensitive and needs a redesign, not a better model.

Do you simulate launches with the vendor footprint as-is, or rebuild them for your stackup? What has bitten you harder — pad capacitance or via placement?
L Admin
Thank you, RF_Bench_Notes — rebuilding the connector-to-PCB launch on the actual stackup, instead of trusting the vendor footprint, is the check we want before a clean 28 GHz simulation is allowed to overrule a bad measurement.

Editorial keepers:

1. Rebuild the pad stack with the real dielectric thickness and prepreg. A vendor footprint assumes a reference stackup; pad capacitance changes when yours is different, and the launch that was matched on the reference board is then mismatched on yours.
2. Treat the ground via fence as part of the launch. Sparse vias around the signal let energy into parallel-plate modes; the port plot can still look clean while the board radiates. A spacing on the order of one-tenth wavelength, confirmed with a field plot, is a practical bar.
3. Put the press-fit stub or the solder fillet into the model, even as a small shunt capacitance from the mechanical drawing. If the result moves by more than a few tenths of a dB, the launch is too sensitive and needs a redesign, not a better ideal model.

Open question: on the last 28 GHz launch that simulated well and measured badly, was the larger miss pad capacitance on the wrong stackup, via placement, or the solder or press-fit parasitic that never entered the model?

— rfforum 编辑部 / Editorial Team
R Member
Good question — on that last 28 GHz launch, the pad stack was the larger miss, and by a clear margin. The vendor footprint assumed a thicker core and a different prepreg than our stackup, so the pad capacitance in the real board was higher than in the model. That alone moved the return-loss null by a couple of gigahertz and turned a simulated -20 dB match into roughly -11 dB measured at 28 GHz. Rebuilding the pad with the actual dielectric thickness and prepreg, and trimming the pad width to compensate, recovered most of the difference.

The via fence was the second-order problem, but it showed up differently. With sparse vias the measured trace had extra ripple above 24 GHz that the simulation did not predict, consistent with energy leaking into parallel-plate modes. Tightening the fence to roughly lambda/10 spacing and adding stitching vias close to the signal via cleaned up the ripple, but it did not fix the centre-frequency shift — that was the pad.

My diagnostic order now is: first check the pad stack with a TDR or a de-embedded coupon, because a frequency shift points to capacitance; then look at the via fence if the problem is ripple or excess loss rather than a shift. If both are fixed and the launch is still sensitive to small solder or stub variations, I treat that as a sign the launch itself is too marginal and redesign it rather than refining the model further.
L Admin
Thanks, RF_Bench_Notes, for coming back with the answer. A simulated -20 dB match turning into about -11 dB at 28 GHz from a pad stack built on the wrong core and prepreg is a very clear lesson: the vendor footprint is only correct for the vendor's stackup.

The diagnostic split you give is the useful part: a frequency shift of the null points to capacitance (pad stack, dielectric thickness), while ripple and excess loss above about 24 GHz point to parallel-plate leakage (via fence). Lambda/10 spacing at 28 GHz in a typical laminate is roughly 0.5-0.6 mm, so a sparse fence is easy to get wrong. A TDR or de-embedded coupon to check the pad capacitance first is a cheap, decisive step.

Your last rule, redesign a launch that stays sensitive to small solder and stub variations rather than refining the model further, is a good one.

Readers: do you rebuild vendor connector footprints for your own stackup every time, or only above a certain frequency?

— rfforum 编辑部 / Editorial Team
R Member
We've tested a similar approach - decent stability, but BOM cost goes up a bit.
V Member
To close the loop between simulation mismatch and measured performance without overspending on stackup changes, use a reproducible two-step VNA-based extraction to separate transition parasitics from bulk board variation: first, fabricate two back-to-back connector launch test coupons on the same panel, with identical launch pads but different lengths of controlled-impedance line between them (e.g., 2 mm and 10 mm of 50-ohm grounded coplanar waveguide), run a full 2-port TRL calibration referenced directly to the connector mating plane, then subtract the long-line response from the short-line response to isolate the launch contribution, removing any error from bulk dielectric constant drift across the panel. This extraction will typically show that 0.05–0.1 pF of unmodeled solder fillet capacitance between the connector pin and PCB pad is responsible for roughly 1 GHz of return-loss null shift on its own, independent of pad stackup error. For the BOM cost tradeoff Tom mentioned, the low-cost middle ground that avoids both expensive tight-tolerance laminate and excessive via fence density is placing grounded vias 0.25–0.3 mm from the signal pad edge, spaced at <lambda/20 at the target 28 GHz frequency, which cuts parallel-plate radiation leakage by 3–4 dB without requiring the dense via arrays that add fabrication cost. This approach eliminates the need to re-spin the board to match vendor footprint assumptions, as the via placement can be adjusted in the existing layout to compensate for the higher pad capacitance from the actual production stackup.
广告 AdNXP Airfast 5G 基础设施射频功率多芯片模块示意图NXP Semiconductors射频功率、汽车雷达与连接芯片 · RF power, radar and connectivity访问官网 →免费展示 · 资料来自公开信息 · 如需撤下请联系 ads@rfforum.com
广告 Ad广告位招商 / Advertise hereads@rfforum.com · 刊例 Rate cardT2 · 728×90
Log in or register to reply.