In practice you need all three — guard band, filtering and coordination — but in a different order than the question lists them, and the order matters because filtering alone cannot fix a planning problem.
Start with measurement and coordination. Before choosing a guard band, I would run a spectrum survey at the private site with the macro on air, recording the received level from the macro across the private band and at the band edges, at the times of day when the macro is busiest. That survey tells you whether the problem is adjacent-channel leakage into your receivers, blocking from a strong out-of-band macro signal, or intermodulation in your own front end. Each has a different fix, and a filter chosen for the wrong one will not help.
Coordination is the cheapest mitigation when it is available: agreeing a frequency plan, a power limit or a TDD pattern with the macro operator, or placing the private small cells so that a building wall or a directional antenna gives 10 to 20 dB of isolation from the macro. I have seen indoor private cells work well next to a macro simply because the building shell and the antenna pattern did the filtering for free.
Filtering belongs at the receiver, not only at the transmitter. A good band-pass filter or a cavity filter at the private base station, with a steep edge at the macro side, protects the LNA from blocking, while a guard band of a few MHz gives that filter room to roll off. If you rely on a guard band alone, you waste spectrum; if you rely on a filter alone, a strong macro signal can still drive the LNA into compression before the filter. I would also check the receiver's blocking and intermodulation figures in the datasheet, because a receiver with poor out-of-band linearity will need both a larger guard band and a better filter than the link budget suggests.